Borehole drilled to a finished diameter of 150mm to a depth of 60m. Installation of permanent pumping equipment and float switch in existing storage tank.
Borehole drilled to a finished diameter of 150mm to a depth of 60m. Installation of permanent pumping equipment and float switch in existing storage tank.